Currently, there is a pressing issue facing new real estate developments across the UK: a significant backlog of projects waiting to connect to the electricity grid, totalling a demand of 27 GW against an available capacity of 37 GW, as reported by our latest research using Grid IQ by Savills Earth. This discrepancy highlights a crucial challenge in the modernisation of our energy infrastructure as grid capacity has not kept pace with the accelerating demand.
Despite the apparent surplus in capacity, several factors prevent projects in the queue from utilising this available capacity. For instance, small power volumes are available nationwide, but these volumes fall short of the requirements for most developments. National Grid indicates that 500 homes typically generate a demand for 1 MW of energy. Grid IQ's analysis reveals that 11% of substations lack the requisite capacity to meet this demand.